Four lines of work,
delivered separately or as one.
General Construction & Contracting
المقاولات العامة والإنشاءات
The core of what we do. We take a project from bare land to a finished, working building and stay responsible for every trade in between. One contract, one team, one point of contact.

- Site preparation, excavation and shoring
- Reinforced concrete structures: foundations, columns, slabs, cores
- Masonry, blockwork and steel structures
- Façade and envelope works
- MEP coordination with the structure
- Waterproofing and thermal insulation
- External works and site services
- Snagging, testing and handover
Read the job properly
Drawings, specifications and site conditions are studied before pricing, so the programme is one we can keep.
Sequence the trades
Concrete, masonry, MEP and finishes are planned around each other, not on top of each other.
Inspect as we go
Every pour and every stage is checked and signed off before the next one starts.
- Setting-out and levels verified by survey before excavation
- Formation level and bearing stratum inspected before blinding
- Reinforcement, cover and embedded items inspected before every pour
- Concrete sampled and tested at approved laboratories
- Waterproofing flood-tested before protection and backfill
- Envelope checked for alignment and watertightness before interiors start
- As-built structural and architectural drawings
- Concrete, steel and material test records
- Inspection requests with consultant sign-off
- Waterproofing and material warranties
- Snag list, closed and countersigned
- Operation and maintenance manuals
Infrastructure & Utilities
البنية التحتية والمرافق
Roads, networks, earthworks and treatment plants — where a site either starts right or pays for it later. Correct levels, correct compaction, correct materials.

- Bulk earthworks, cut and fill, grading
- Roads, paving and asphalt works
- Water supply networks
- Sewage, drainage and stormwater networks
- Water and wastewater treatment plants
- Desalination plants, tanks and pump stations
- Utility trenches, ducts, manholes and substations
- Kerbs, sidewalks and site lighting bases
Survey first
Levels and existing services are confirmed on the ground before a machine moves.
Control the layers
Each layer is compacted and tested before the next one goes down.
Keep the site moving
Works are phased so access, traffic and neighbouring activities keep running.
- Existing services located and marked before excavation
- Subgrade proof-rolled and density-tested
- Each fill and base layer tested before the next is placed
- Pipe bedding, gradients and joints inspected before backfill
- Pressure and leakage tests on water and drainage lines
- Asphalt temperature, thickness and compaction recorded
- As-built network drawings with coordinates and invert levels
- Compaction, material and asphalt test records
- Pressure and leakage test certificates
- Manhole and chamber schedules
- Authority inspection and connection records
- Commissioning records for plants and pump stations
Good landscape starts below the ground.
الحدائق الجميلة تبدأ من تحت الأرض.
Landscape Works
تنسيق المواقع (اللاندسكيب)
Landscape is the first thing people see and the last thing most contractors think about. We treat it as real construction: proper sub-base, drainage and irrigation, then planting and finishes on top.

- Hardscape: paving, walkways, plazas and steps
- Softscape: planting, lawns and trees
- Irrigation networks and pump rooms
- Water features and fountains
- Outdoor and feature lighting
- Shading structures and site furniture
- Boundary walls, fences and gates
- Establishment and maintenance period
Build the base right
Levels, falls and drainage are fixed before any finish is laid.
Choose what survives
Plants and materials are selected for the local climate and the maintenance available.
Hand over a living site
We stay through the establishment period until the landscape has settled.
- Finished levels and falls checked before any surface is laid
- Sub-base compaction verified under all paving
- Irrigation mains pressure-tested before backfill
- Soil mix and planting pits inspected before planting
- Plant material inspected on delivery against the schedule
- Lighting and water features tested and commissioned
- As-built hardscape, irrigation and lighting drawings
- Planting schedule as installed
- Irrigation controller programme and zoning plan
- Pump, lighting and equipment warranties
- Maintenance manual for the establishment period
- Handover inspection record
Project & Construction Management
إدارة المشروعات والتشييد
For owners who need the discipline of a contractor on their side of the table. We plan, control and report the whole job — programme, cost, quality and contracts — whoever builds it.

- Project and construction management
- Planning and scheduling (Primavera P6)
- Cost control, budgets and cash-flow
- Contract administration and claims
- Tendering and bid evaluation
- Construction method and value engineering
- Quality and HSE audits
- Progress reporting to owners and lenders
Baseline everything
A programme, a budget and a risk register agreed at the start — and measured against every week.
Report plainly
Progress, cost and risk in one page the owner can act on.
Protect the budget
Value engineering and tight control of variations, without touching quality.
- Baseline programme and budget approved before mobilisation
- Weekly look-ahead schedules and progress measurement
- Monthly cost and variation reports
- Risk register reviewed at every progress meeting
- Submittal and query registers kept live
- Independent quality and safety audits
- Baseline and updated programmes
- Monthly progress and cost reports
- Variation and claims register
- Tender evaluation reports
- Close-out and final account file
- Lessons-learned report